**This post contains affiliate links**Another day, another freeze drying adventure. Our Harvest Righ...
Product was sent to me by PhotoWall based out of Sweden. All opinions are my own.A company reached o...
We have lived in Ridgecrest, CA for almost 4 years now. I can't even believe it's been that long alr...
*This post may contain affiliate links*Since we are doing this project in the middle of the Ridgecre...
It took us 17 hours over 6 days to shingle the roof and put down the railing system for the solar panels.
This is going to be a two step process of hooking up the subpanel to the combiner box and then combiner box to the solar panels.
One of the biggest worries that I had with doing the roof was getting the shingles ontop. So we built a shingle lift to get them up there.
We are finally able to start installing the solar panels.
Now that everything is hooked up we tested it out with a minor issue and called the inspector to pass everything off.
We drive by this area occasionally, usually on our way to Idaho. But we've never taken the chance to...
 Snagged this picture as we drove by after going up to Whitney Portals. This is where we ate, outsi...
Smokey views all the way up to the portals. But when we got up there it was a little better. I guess...